Manufacturing facility, Johor: RM 1.67M a year in avoidable cost identified
| Sector & location | Manufacturing, Johor (TNB E2 tariff). Client name withheld. |
| Challenge | Electricity bill of RM 366,224 a month with no visibility of which loads or charges were driving cost. |
| Infinergi's role | Project lead: monitoring deployment, data analysis, recommendations and implementation support. |
| Solution | Eniscope IoT sub-metering across HVAC, production lines and compressed air; maximum demand review; idle-equipment and HVAC measures. |
| Key finding | Maximum demand over-declared by 1,457 kW, plus idle equipment running and HVAC inefficiency. |
| Baseline | TNB billing data before monitoring, compared with monitored consumption. |
| Results | RM 139,622 a month (38% of the bill) of avoidable cost identified, about RM 1.67 million a year. |
| Method | Partly measured: savings from measures already implemented are measured with monitoring data; the remainder are projected from monitored consumption and the site's tariff. |

Industrial warehouse, Johor: 180.7 kWp rooftop solar
| Sector & location | Industrial warehouse, Johor. Client name withheld. |
| Challenge | High daytime consumption during production hours and a large, unused flat roof. |
| Infinergi's role | Design, approvals and installation (EPC). |
| Solution | 180.7 kWp rooftop solar PV sized to the production-hour load profile, under the Solar ATAP programme. |
| Results | Estimated savings of about RM 32,000 a month and an estimated payback of about 3.5 years. |
| Method | Modelled estimate from system design yield and the site's tariff. Actual generation is tracked on the live monitoring portal. |
Other solar installations
Savings shown are estimates based on system size, roof orientation and the owner's tariff.
Commercial complex rooftop
Office and retail building, Peninsular Malaysia. Full available roof area used, sized to daytime load. Estimated 62% bill offset and about 4-year payback.
Bungalow, 17.5 kWp
Two-storey bungalow with panels across several roof planes. Estimated bill offset above 55% and about 4-year payback.
Terrace house, 10 kWp
Double-storey terrace, installed in one day. Estimated bill offset above 50% and about 4-year payback.
Technology partner references
These projects were not delivered by Infinergi. They are deployments of the Eniscope platform, which Infinergi represents in Malaysia as the official Eniscope and Best.Energy partner, and show what the technology achieves at scale.
KFC Malaysia, 105 outlets
Nationwide Eniscope deployment. Monitoring found HVAC, refrigeration and lighting-schedule waste. Average energy saving of 18%.
7-Eleven Denmark, 120+ stores
Average saving of 11.5%, 2.7 million kWh and 864 tonnes of CO₂ saved. The programme expanded to Norway and Sweden.
Secret Recipe Malaysia
Multi-site Eniscope monitoring with refrigeration and HVAC optimisation across the outlet portfolio.
Client names are shown only where approved. For a reference call or a site visit to an Infinergi project, ask during your assessment.
Related guides
Factories & manufacturing
Maximum demand, compressed air, motors and process cooling: where factories lose money.
Energy efficiency & solar in Johor
Our strongest market: Johor projects, areas we cover and how to get a free audit.
Free energy audit
What you get, what we need from you, and how we deliver a RM savings projection in 5 business days.