Energy monitoring at a manufacturing facility in Johor
Delivered by InfinergiPartly measured

Manufacturing facility, Johor: RM 1.67M a year in avoidable cost identified

RM139KAvoidable cost / month
38%Of monthly bill
RM1.67MPer year
Sector & locationManufacturing, Johor (TNB E2 tariff). Client name withheld.
ChallengeElectricity bill of RM 366,224 a month with no visibility of which loads or charges were driving cost.
Infinergi's roleProject lead: monitoring deployment, data analysis, recommendations and implementation support.
SolutionEniscope IoT sub-metering across HVAC, production lines and compressed air; maximum demand review; idle-equipment and HVAC measures.
Key findingMaximum demand over-declared by 1,457 kW, plus idle equipment running and HVAC inefficiency.
BaselineTNB billing data before monitoring, compared with monitored consumption.
ResultsRM 139,622 a month (38% of the bill) of avoidable cost identified, about RM 1.67 million a year.
MethodPartly measured: savings from measures already implemented are measured with monitoring data; the remainder are projected from monitored consumption and the site's tariff.
180.7 kWp rooftop solar on an industrial warehouse in Johor
Delivered by InfinergiModelled estimate

Industrial warehouse, Johor: 180.7 kWp rooftop solar

180.7 kWpSystem size
~RM32KEst. saving / month
~3.5 yrsEst. payback
Sector & locationIndustrial warehouse, Johor. Client name withheld.
ChallengeHigh daytime consumption during production hours and a large, unused flat roof.
Infinergi's roleDesign, approvals and installation (EPC).
Solution180.7 kWp rooftop solar PV sized to the production-hour load profile, under the Solar ATAP programme.
ResultsEstimated savings of about RM 32,000 a month and an estimated payback of about 3.5 years.
MethodModelled estimate from system design yield and the site's tariff. Actual generation is tracked on the live monitoring portal.

Other solar installations

Savings shown are estimates based on system size, roof orientation and the owner's tariff.

Modelled estimate

Commercial complex rooftop

Office and retail building, Peninsular Malaysia. Full available roof area used, sized to daytime load. Estimated 62% bill offset and about 4-year payback.

Modelled estimate

Bungalow, 17.5 kWp

Two-storey bungalow with panels across several roof planes. Estimated bill offset above 55% and about 4-year payback.

Modelled estimate

Terrace house, 10 kWp

Double-storey terrace, installed in one day. Estimated bill offset above 50% and about 4-year payback.

Technology partner references

These projects were not delivered by Infinergi. They are deployments of the Eniscope platform, which Infinergi represents in Malaysia as the official Eniscope and Best.Energy partner, and show what the technology achieves at scale.

Partner referenceMeasured

KFC Malaysia, 105 outlets

Nationwide Eniscope deployment. Monitoring found HVAC, refrigeration and lighting-schedule waste. Average energy saving of 18%.

Partner referenceMeasured

7-Eleven Denmark, 120+ stores

Average saving of 11.5%, 2.7 million kWh and 864 tonnes of CO₂ saved. The programme expanded to Norway and Sweden.

Partner reference

Secret Recipe Malaysia

Multi-site Eniscope monitoring with refrigeration and HVAC optimisation across the outlet portfolio.

Client names are shown only where approved. For a reference call or a site visit to an Infinergi project, ask during your assessment.

Ready to cut your energy bill?

Free energy assessment. No cost, no obligation. Send your TNB bills and get a written RM savings projection, with assumptions, within 5 business days.