Industry · Factories & manufacturing

Energy efficiency for factories & manufacturers.

Manufacturing has the biggest energy savings potential of any sector. We find the waste in maximum demand, compressed air, motors and process cooling, then add solar sized to what's left.

SEDA registeredCertified teamOfficial Eniscope & Best.Energy partner in Malaysia

By the Infinergi energy team · Last updated 23 October 2026

Quick answer

Malaysian factories typically cut electricity costs by 20 to 40% by fixing maximum demand charges, compressed-air leaks, idle machines, motor and fan speeds, and process cooling, then adding rooftop solar. Infinergi measures every major load with Eniscope IoT sub-metering first. At a Johor plant this identified RM 139,622 a month (38%) of avoidable cost.

Where factories lose money on electricity

AreaTypical problemFix
Maximum demandOver-declared demand, simultaneous start-ups, peaks during shift changesDemand review, start-up sequencing, battery peak shaving
Compressed airLeaks, pressure set too high, compressors running at weekendsLeak surveys, pressure reduction, schedules, VSD compressors
Motors, pumps & fansRunning at full speed regardless of demandVariable speed drives, IE3/IE4 motors
Process cooling & chillersPoor sequencing, fixed set-pointsChiller optimisation, set-point reset
Idle machinesMachines left on between shifts and over weekendsSmart switches and cloud schedules
Office & plant HVAC, lightingRunning outside production hoursSchedules, LED high-bays with sensors
Power factorTNB penaltiesPower factor correction

Case study: RM 1.67M a year at a Johor plant

A Johor manufacturing facility on TNB's E2 tariff was paying RM 366,224 a month. Eniscope monitoring identified RM 139,622 a month (38%) of avoidable cost, about RM 1.67 million a year, including 1,457 kW of over-declared maximum demand, idle equipment and HVAC inefficiency, before any solar was installed.

38%Bill reduction
RM139KMonthly savings
RM1.67MAnnual savings

How we work with manufacturers

  1. Free TNB bill analysis: tariff, maximum demand, power factor and fuel-adjustment exposure, with savings in RM.
  2. Eniscope sub-metering on main incomers, compressors, chillers and production lines, installed in hours with no production downtime.
  3. 2 to 4 weeks of data, then a ranked list of measures with cost, saving and payback.
  4. Implementation with smart controls, VSDs, compressed-air fixes and demand management.
  5. Rooftop solar and storage sized to your new, lower load. Industrial systems run from 50 kWp to 5 MWp+.
  6. Ongoing monitoring and ESG reports for your customers and for EECA 2024.

Solar for factories

Factories have the best solar economics of any segment: large roofs and heavy daytime use. Industrial systems typically offset 40 to 80% of the bill with a 2 to 4-year payback. With a PPA you start with zero capital, and if you buy outright the Green Investment Tax Allowance runs until 31 December 2030. Commercial and industrial solar explained.

FAQ

Frequently asked questions

How can a factory reduce its electricity bill in Malaysia?
Start with the tariff: check declared maximum demand and stagger large start-ups. Then measure compressed air, motors, process cooling and idle machines with IoT sub-metering to find waste. Fix leaks, add controls and VSDs where data shows the best return, and finish with rooftop solar sized to the reduced load. Factories typically save 20 to 40%.
What is maximum demand and why does it matter for factories?
On industrial tariffs you pay for the highest kW demand recorded in the month as well as for energy used. Over-declared demand or one badly timed start-up can cost thousands of ringgit a month. In one Johor plant we found 1,457 kW of over-declared maximum demand.
Does my factory need to comply with EECA 2024?
If your total energy use (electricity plus fuels) is 21,600 GJ or more over 12 months, about 500,000 kWh of electricity a month on average, you are a regulated energy consumer and must appoint a registered energy manager, run an energy management system and carry out audits.
Can a factory install solar with no upfront cost?
Yes. Under a solar PPA an investor installs and maintains the system and you buy the power below your TNB rate. Companies that buy outright can claim the Green Investment Tax Allowance, which runs until 31 December 2030 (confirm eligibility with MGTC).

Ready to cut your energy bill?

Free energy assessment. No cost, no obligation. Send your TNB bills and get a written RM savings projection, with assumptions, within 5 business days.